Monday, December 6, 2021

K-Electric

K-electric advises caution ahead of monsoon season

Ahead of the monsoon season, K-Electric reiterated the importance of safety during and beyond the expected rains. The power utility urged its valued customers to adopt necessary precautionary measures to avoid any safety hazards. Karachi was among the most affected...

KE announces Rs 2.57 billion net profit in 1Q21

The net profit of K-Electric for the first quarter ending on March 31, 2021, jumped 221pc to Rs2.562bn from Rs797m in the same period last year, despite extensive impairment loss against trade debts during the same period. KE's revenue, including...

KE’s BQPS-III first turbine commissioning on fast track

K-Electric’s flagship 900 MW power plant, BQPS-III is progressing on a fast track basis. The entire power train of the first Unit consists of Gas Turbine, Steam Turbine, Generator, and Heat Recovery Boiler that have arrived and were installed...

K-Electric’s rigorous move against power theft and defaulters, 15000 illegal hooks removed

K-Electric has initiated rigorous, non-discriminatory crackdown against power-thieves and defaulters across the city. The power utility along with Law Enforcement Agencies (LEA) has conducted kunda-removal drives in several parts of Karachi including Surjani, Korangi, Mauripur, Lyari and Garden, with...

K-Electric roots out 7000 illegal hook connections in metropolis

In continuation of K-Electric’s massive crackdown against defaulters and power theft, the power utility has conducted kunda-removal drives in several parts of Karachi including Surjani, Bin Qasim, Gulshan, North Karachi and areas of Lyari. Over 7,000 illegal hook connections...
- Advertisement -spot_img

Latest News

Pakistan to introduce national Artificial Intelligence Policy soon

Cyber security is the first important pillar of digital policy 2021 of IT Ministry. Digital transformation of Pakistan corresponds...
- Advertisement -spot_img